Posts tagged Dimensional Results
2 articles

Product and Platform Updates
Inspection PlanControl Plan
Control Plan to Inspection Plan: How We Build the Cascade's Last Document
The Inspection Plan is the document that produces your PPAP Element 9 dimensional results, and it is usually the fourth blank tab someone fills out by hand. Here is how QualityEngineer.ai generates it from the same characteristics that built your Control Plan, the real customer data bug that taught us to post-process the output, and what an engineer still has to do.
September 30, 202610 min read

Audits and Compliance
AS9102AS9102C
AS9102 Form 3 Dimensional Results: How Do You Catch an Out-of-Tolerance Characteristic Before the FAI Ships?
The FAI that gets rejected two weeks after you ship it usually fails on one out-of-tolerance result nobody flagged. Here is how QualityEngineer.ai records AS9102 Form 3 dimensional results against the ballooned drawing so every measured value is checked against its own tolerance the moment it is entered, not by the customer's source inspector.
August 2, 202611 min read