Quality engineering software for manufacturers
From the shop floor to a decision you can defend.
QualityEngineer.ai drafts and checks the records behind your PPAP, corrective actions, and supplier quality decisions. It shows what’s missing so your engineers can review the evidence and sign.
No card required. Encrypted at rest and in transit.

Wheel hub · WH-2210 · Revision B
Is this control plan ready to sign?
The plan traces back to its PFMEA and calls for a coordinate measuring machine to check the bearing bore. QE flags that gauge G-117 has no measurement system analysis (MSA) study attached. The engineer reviews the finding and decides whether to sign.
See example documentsControl Plan CP-2210 / Production
Wheel hub WH-2210, part revision B
Built from
PFMEA FM-2210
| Op | Characteristic | Specification |
|---|---|---|
| 20 | Bearing bore diameterSCCMM G-117, 1 per 50 | 62.000 +0.030 / 0 mm |
| 20 | Bore roundnessAir gauge, 100% | 0.008 mm |
| 30 | Stud press forceCCLoad cell, 100% | 18 to 24 kN |
Drafted by
QualityEngineer.ai
Approved by
Awaiting signature
Follow the bearing bore from drawing to inspection.
The drawing, Control Plan, and Inspection Plan show the bore dimension for the same part revision. The Process Flow records the finish-bore operation, and the PFMEA records what can go wrong. QE keeps those document links visible so the review can follow them back to the source.
- Sources
- Each document records the document it was built from.
- Process facts
- When a Control Plan, PFMEA, or Inspection Plan relies on a process fact, the rows that use it are marked declared, because you told us, or assumed, our default that nobody has confirmed. One click confirms or corrects it, and every later document for your organization uses your answer.
- Completeness
- For each part’s PPAP package, a check that uses no AI model reports what share of the required links between documents are present, such as a control plan line and a capability study for every SC and CC characteristic, and lists the ones that are missing. It is reported apart from the quality score, never averaged into it.
- 01DrawingWH-2210, rev BPart revision BBalloon 7Bearing bore diameterSC, special characteristicDesign requirementSpecification: 62.000 +0.030 / 0 mm
- 02Process FlowPF-2210Linked through part revision BOp 20Finish boreOperation
- 03PFMEAFM-2210Source: Process Flow PF-2210Op 20Failure mode: bore oversizeFinish bore
- 04Control PlanCP-2210Source: PFMEA FM-2210Op 20Bearing bore diameterSC, special characteristicCMM, 1 per 50Specification: 62.000 +0.030 / 0 mm
- 05Inspection PlanIP-2210Source: Control Plan CP-2210Item 3Bearing bore diameterOp 20, CMM, 1 per 50Specification: 62.000 +0.030 / 0 mm
Findings from an 8D, 5-Why, or Fishbone arrive as proposed changes to the Control Plan, PFMEA, or Inspection Plan you choose. You review each change row by row, and the document does not change until an engineer applies the approved change as a new revision, which records the investigation as its source.
What is included
The work a quality team does every week, in one place.
- EvaluateReview PPAP submissions element by element and score suppliers on their PPAP results, on-time submission, and approval rate.
- BuildDraft Process Flows, PFMEAs, Control Plans, and Inspection Plans, each built from the one before it, with that source recorded.
- PackageAssemble all 18 PPAP elements, confirm the required ones are present, and cross-check the Process Flow, PFMEA, Control Plan, MSA, and capability studies before the package goes out.
- CorrectRun 8D, 5-Why, and Fishbone investigations, then propose what you learn as changes to your Control Plans, PFMEAs, and Inspection Plans for an engineer to apply.
- MonitorSee open actions, overdue items, score trends, supplier comparisons, and audit readiness in one place.
- AnalyzeCapability, Gauge R&R, SPC, ANOVA, DOE, regression, and sampling, with plain-language interpretation.
- Blueprint IntelligencePull dimensions, tolerances, GD&T callouts, and special characteristics from engineering drawings.
Standards and methods
Workflows follow the AIAG manuals and VDA 6.3 in automotive, AS9100 and AS9102 first article inspection in aerospace, and ISO 9001 and ANSI/ASQ Z1.4 sampling in general manufacturing.
- IATF 16949
- AS9100
- AS9102
- ISO 9001
- AIAG PPAP
- APQP
- PFMEA
- MSA
- SPC
- VDA 6.3
- ANSI/ASQ Z1.4

Who it is for
- Supplier quality engineers
- Quality managers and directors
- APQP and launch program managers
- Manufacturing and process engineers
- Tier 1, Tier 2, and contract manufacturers
Who builds it
“The paperwork was never the hard part of the job. The hard part was doing all of it while also trying to engineer better products.”
QualityEngineer.ai was started in 2025 by Daniel and Pat Crouse after years in manufacturing quality: writing PPAPs by hand, chasing supplier corrective actions, and losing weeks to audit prep.
About the companyHow we protect your dataHow our CFO agent’s numbers are verified
Try it on a real part.
Upload a drawing or a PPAP package and see what it finds. The trial runs 30 days, needs no card, and your data is kept separate from every other organization’s.