AI-Powered Quality Engineering

APQP Software for New Product Launch Planning

AI-generated APQP timelines with interactive Gantt planning

Generate a complete APQP plan from a single prompt. The Launch module produces a full phase-gate timeline with task dependencies, responsible owners, and due dates -- then renders it as an interactive Gantt chart you can edit inline. AI tracks open actions, flags at-risk milestones, and connects launch deliverables directly to the Control Plans, PFMEAs, and PPAP packages being built in parallel.

Key Capabilities

AI-Generated APQP Timeline

Describe your program -- part, customer, launch date -- and AI generates a full APQP phase plan with tasks, owners, and durations mapped across all five AIAG phases.

Interactive Gantt Chart

Drag, resize, and reorder tasks directly on the Gantt. Inline editing with dependency lines, section collapse, sticky phase labels, and a 52-week rolling view.

Phase-Gate Tracking

Track deliverables and sign-offs across all five APQP phases. Gate reviews surface open actions and missing documents before the team advances.

Task Dependencies

Define finish-to-start dependencies between tasks. The Gantt visualizes the critical path and automatically flags downstream impact when a milestone slips.

Excel Export

Export the full APQP timeline to Excel for sharing with customers, program managers, or stakeholders who work outside the platform.

Launch-to-PPAP Linkage

APQP deliverables link directly to the Build and Package modules. Control Plans, PFMEAs, and Process Flows generated during the program flow into the PPAP package with full traceability.

Built for APQP program teams in automotive and manufacturing

APQP program managers planning new model year launches at Tier 1 suppliers
Quality engineers responsible for PPAP timing and phase-gate deliverables
New product introduction (NPI) teams at automotive Tier 2 and Tier 3 suppliers
Supplier quality engineers tracking APQP status for multiple concurrent programs
Program managers at OEM development and procurement teams
IATF 16949 management representatives tracking new product launch conformance

How AI accelerates APQP planning

  • Generates a complete APQP timeline from a single program description -- part number, customer, launch date, and commodity
  • Maps tasks to the correct AIAG APQP phase (Plan and Define, Product Design and Development, Process Design and Development, Product and Process Validation, Feedback)
  • Flags at-risk milestones when task progress lags behind the scheduled timeline
  • Answers natural-language questions about the program -- "What is open in Phase 3?" or "Which tasks are on the critical path?"
  • Regenerates the timeline idempotently when scope changes -- replaces existing phases cleanly without creating duplicates
  • Connects APQP deliverables to in-progress Control Plans, PFMEAs, and PPAP packages in the Build and Package modules

How it works

  1. 1Describe the program
  2. 2AI generates timeline
  3. 3Review and edit Gantt
  4. 4Assign owners
  5. 5Track phase gates

Frequently Asked Questions

What is APQP and why does it matter?
Advanced Product Quality Planning (APQP) is a structured product development framework defined by the AIAG that ensures a new product or process meets customer requirements before launch. It defines five phases -- Plan and Define, Product Design and Development, Process Design and Development, Product and Process Validation, and Feedback, Assessment and Corrective Action -- each with required deliverables. APQP is mandatory for suppliers to major automotive OEMs including GM, Ford, and Stellantis, and is a core requirement of IATF 16949. Without a documented APQP plan, suppliers cannot complete a PPAP submission or achieve production part approval.
How does AI generate an APQP timeline?
You provide a program brief -- part name, customer, launch date, and commodity type. AI maps the program to the five AIAG APQP phases, generates tasks with standard durations based on the program timeline, assigns deliverables to the correct phase, and sets finish-to-start dependencies between tasks. The result is a complete Gantt-ready APQP plan in seconds. You can then edit any task inline, reassign owners, adjust dates, and add custom tasks specific to your customer requirements.
Can I edit the AI-generated plan?
Yes -- fully. The interactive Gantt supports inline editing for task names, durations, and owners. You can drag tasks to reschedule them, resize bars to extend or shorten durations, add dependencies between tasks, reorder tasks within a phase, and collapse sections to focus on a specific phase. Changes are saved in real time. The AI can also be prompted to add tasks, remove phases, or regenerate the timeline if the program scope changes -- without duplicating existing data.
How does the Launch module connect to PPAP?
APQP and PPAP are closely linked -- the APQP plan drives the timing and content of the PPAP submission. In QualityEngineer.ai, APQP deliverables in the Launch module link directly to documents being built in the Build module (Control Plans, PFMEAs, Process Flow Diagrams) and to the 18-element PPAP package in the Package module. As documents are completed, they update the corresponding APQP deliverable status. This gives program managers a single view of launch readiness -- what is built, what is approved, and what is at risk.
Does this support IATF 16949 requirements for new product launches?
Yes. The Launch module is designed around the AIAG APQP reference manual (4th Edition) and supports the new product introduction requirements of IATF 16949 clause 8.1 and 8.3. Phase-gate tracking, deliverable documentation, and traceability from APQP tasks to completed quality documents provide the audit evidence required during IATF surveillance and recertification audits. The connected Build and Package modules ensure that control plans, risk assessments, and measurement plans required at each phase gate are documented and linked to the program record.
Can I export the APQP plan to share with customers?
Yes. The Gantt timeline exports to Excel, which is the format most customers and program managers expect for APQP review meetings. The export includes phase breakdowns, task names, planned start and end dates, assigned owners, and completion status. For customers who require a specific APQP template format, the export can be mapped to their preferred structure.